THE WARNING SIGNS
How to know your board is overdue
If your board has ceramic fuses, no safety switches, or it trips without an obvious cause, it’s overdue for a look. Most Bundaberg homes built before the 1990s are running a board that was never designed for what a modern house pulls through it.
How it works
Your switchboard upgrade, step by step
01
We inspect your board
Condition, capacity, and what your home actually draws. Planning solar or an EV charger? We factor that in too.
02
One fixed quote
The whole job priced up front. If we find something unexpected once we're in, we stop and talk to you first.
03
Swapped in about a day
Most upgrades are done within a day. The power's off for part of it, and we tell you exactly when.
Tested and certified
Safety switches proven, circuits labelled, certificate in your hand.
SEE THE DIFFERENCE
The same board, before and after
A real Bundaberg meter box. The old board opened up: rats-nest wiring, corroded breakers and debris sitting in the enclosure. Then the same box finished, with labelled RCBOs and safety-switch protection on every circuit.

Before

After
Reviews
What Bundaberg says
Verified Google reviews from real customers across Bundaberg and the region.
Real jobs, around Bundaberg

Sungrow battery install

Bathroom lighting and mirror

Kitchen pendants going in

Split system, outdoor unit

Switchboard upgrade, new RCDs

Solar array on a Bundaberg roof

Tesla wall charger, home install

Need a sparky in Bundaberg?
Someone answers, day or night.
Common questions
Switchboard questions, straight answers
The things people ask us before booking a switchboard upgrade in Bundaberg.
How do I know if my switchboard needs upgrading?
The classic signs are ceramic fuses, no safety switches, frequent tripping, flickering lights, or a board with no spare room. If you've got any of those, it's overdue. Not sure? Send us a photo of your board and we'll give you a straight answer, no charge.
What does a switchboard upgrade cost?
It depends on the board's condition, how many circuits you've got, and whether the wiring behind it needs work. That's why we inspect first. You then get one fixed price for the whole job, and it doesn't move unless you change what you're asking for.
What's a safety switch, and do I need one on every circuit?
A safety switch, or RCD, cuts power in milliseconds when electricity leaks to earth. It protects people, not just wiring. Fuses and circuit breakers don't do that job. We install to the current standard, which puts that protection on every circuit in the house.
Will my old board handle solar or an EV charger?
Often not without changes. Older boards lack both the capacity and the spare ways a solar inverter or EV charger needs. We check that during the inspection, so the upgrade you pay for suits what you're planning, not just what you've got now.
How long does a switchboard upgrade take?
Most homes are done inside a day, with the power off for part of it. We confirm the timing before we start so you can plan around it. If yours is a bigger board or the wiring behind it needs work, we'll tell you that at quote stage.
Do I get a certificate when it's done?
Yes. Every upgrade comes with a Certificate of Testing and Compliance. Safety switches are proven on the day, circuits are labelled, and you keep the paperwork. Insurers and conveyancers ask for it, so file it somewhere you'll find it again.
GET A FIXED QUOTE
Tell us about your board
Send a photo of your switchboard and a few details. We’ll call you back within the hour with a straight answer and a fixed price. No obligation.
Where we work
Switchboard upgrades across the Wide Bay
Switchboard upgrades across Bundaberg, Bargara, Kepnock, Avoca and out to Childers, Gin Gin and the Wide Bay. Not sure if we reach you? Just ask.
Bundaberg
Bargara
Kalkie
Kepnock
Avoca
Branyan
Gooburrum
Moore Park Beach
Burnett Heads
Innes Park
Coral Cove
Elliott Heads
Childers
Gin Gin
Hervey Bay
Maryborough
5.0★
Google rating
Licensed
Insured
Think your board is overdue?
Send a photo of your board and we’ll tell you straight, or get a fixed quote.
